Technical resource

Building a small mixed BOM for a memory and SSD upgrade

A short memory-plus-SSD upgrade list: exact part numbers, matching rules and host details. Not a stock list and not a rewrite of the Server Upgrade or Mixed BOM pages.

A memory-and-SSD upgrade often fails at the enquiry stage because the buyer sends two separate part numbers and hopes the quotes will still form one usable set. For a small mixed bill of materials, the useful unit is the kit: the host, every memory line, every drive line, and the mechanical items that make those parts sit in the same chassis. This page is a checklist for building that short BOM before you request a quote. It does not replace the existing Server Build & Upgrade Procurement or Mixed BOM Procurement pages, and it does not rewrite them.

YOUSHI coordinates supplier quotations from China for specified server parts. This article is not a stock list, a price list, a lead-time promise, or a statement that any two modules or drives are interchangeable. It is also not a YOUSHI warranty or condition policy. Those terms, if any, have to be confirmed on the specific offer you are sent.

Treat the upgrade as one short BOM, not two loose SKUs

Write the request as a numbered list, even when it is only a handful of lines. Each line should stand on its own if a supplier can quote only part of the list. A practical minimum is:

  • Line number and role (for example, “DIMM kit, 2 pieces, matched set” or “boot drive, 1 piece”).
  • Exact manufacturer or OEM part number, including any suffix you can read.
  • Quantity, and whether the quantity is a matched set or independent pieces.
  • The host server, motherboard, or approved population rule, if you have it.
  • Condition language you will accept — and the questions you still need answered, rather than a vague grade word.
  • Anything that must match another line (same rank and speed across the DIMM set; same interface and carrier across a drive pair).

If you already have a broader mixed-BOM process, keep using Mixed BOM Procurement and BOM Procurement Coordination for multi-supplier coordination. This page only adds the memory-plus-SSD details that usually get dropped when the upgrade looks “simple.”

Memory lines: identification first, then condition

For each memory line, start with the exact module part number and a clear photo of the label when you are replacing an installed DIMM. Density alone is not enough. Rank, organization, speed, voltage, and registered versus unbuffered type still have to match the host rule. Named examples already on this site, such as Kingston KSM56E46BD8KM-32HA and the FORESEE UNCIA 3856 rows listed under Server Memory, show how a part number is recorded. Those pages are specification examples, not a statement that any module is in stock.

If the original DIMM is short or the label is incomplete, use the identification checklist in What to include in a server memory RFQ when the original DIMM is short or obsolete. If a supplier answers with “new,” “pull,” or “tested,” ask the questions on Questions to ask about new, pull, and tested server memory before you request a quote before you compare prices. Condition words are not a substitute for the part number, and they are not a warranty.

For a matched memory set, say so on the BOM. Ask whether all modules will share the same part number, rank, and speed, and whether date codes or SPD revisions will be kept in a stated range. If mixed date codes are acceptable to you, write that down; if they are not, write that down too. Do not leave the matching rule to be discovered at receiving.

SSD lines: interface and carrier, not capacity alone

For each drive line, name the interface (SATA, SAS, or NVMe), the form factor, the endurance or drive-write rating if you have it, the carrier or tray, and any firmware or feature bit you already depend on (encryption, SED, or a vendor-specific firmware family). Capacity is necessary and not sufficient. The checklist in Specifying an enterprise SATA or SAS SSD replacement beyond capacity covers the SATA/SAS case; use the same discipline for NVMe, including the bay, backplane, and cable or adapter if the drive does not sit in a standard carrier.

If the upgrade mixes a boot device with a data or cache device, give each line its own role and part number. A “same family” description is not an order code. Existing series pages such as Enterprise SATA / SAS SSD and Enterprise NVMe SSD can help you see how those categories are named on this site; they are not a stock list and they do not authorize a substitution.

Hardware that is easy to omit and expensive to discover later

A small memory-and-SSD upgrade still has mechanical lines. Include them on the same BOM when they are required for the host:

  • Drive carriers, trays, or caddies, identified by the server vendor part number if you have it.
  • Any riser, cable, or adapter that the new drive needs and the old drive did not.
  • Population rules that affect vacant slots — for example, a two-DIMM kit that must occupy specific channels.

If you do not have those part numbers, say so and send a photo of the installed carrier or empty bay. Do not invent a “standard tray” or assume that a module and a drive quoted by two suppliers will arrive with the hardware needed to install them together.

What this BOM should not claim

Do not turn a manufacturer cross-reference, a “compatible with” line, or a similarly named density into a substitute part number. If you are open to an officially documented manufacturer successor, name the original code and ask whether that successor is actually being offered — and whether it is approved for your host. A manufacturer change notice is not a YOUSHI supply confirmation.

Do not ask the supplier to guarantee stock, price, or lead time in language you cannot verify, and do not treat a page on this site as evidence that a part is on the shelf. If only some lines can be quoted, ask the supplier to say which lines are covered and which are not, so you can decide whether the partial kit is still useful.

How to enquire

Send the short mixed BOM, host identity, label photographs, and any matching or condition rules from Contact. If you already have a fuller project list, you can also use the process described on Server Build & Upgrade Procurement. Quote requests that name exact part numbers and the kit rules are the ones a supplier can answer without guesswork.